Contact

Tell us where your programme stands

Say what is working and what is not. We read every message and reply by email.

Prefer email? contact@ainurinsights.com·Open as a page

Planning

Planning at contract level where the system showed only totals

Contract-level

Contract-level granularity and full history where the legacy system summed everything into aggregates.

The engagement: existing, as built, in production

Existing

The challenge

The legacy system summed all cash flows into aggregated totals, hiding individual contract performance and blocking sensitivity analysis. Manual spreadsheet dependencies and the limits of a proprietary tool stood in the way of long-term IFRS projections.

The same problem elsewhere

The same granularity applies wherever a system shows only totals: cost per site, per product, per project, per customer.

Insurance & reinsurance
Contract-level planning and projections where the legacy tool only ever showed the book in total.
Manufacturing & engineering
Cost and margin by product and order where the ERP reports only by plant.
Logistics & transport
Profitability by lane, contract and customer where the system aggregates to the region.
Energy & utilities
Asset-level cash flows where the planning model shows only the portfolio.

Bring us the version of this you are living

Every engagement here started as somebody’s stuck programme. Tell us where yours stands.

contact@ainurinsights.com